Monday, November 30, 2009

ready to move to new site


Friday, November 27, 2009

only a skeleton crew today
using up the last of the sod

getting ready for the next site

Thursday, November 26, 2009

helping with the sod
almost done with the sod that we have


door pulls being put on

finally done

Wednesday, November 25, 2009

more of the same
between the showers

Tuesday, November 24, 2009

now to cut all the brick

laying the sod between the back of the units


Monday, November 23, 2009

preparing for the sod

preparing the front for the sod

start of the sodding

first lawn done

start of the inter lock bricks

Friday, November 13, 2009

No updates for the week of November 16th to 21st.
On Vacation
ready for the pour
making the stair landing

getting the washer connections ready


installing the vanities

Thursday, November 12, 2009

installing the stove vent
setting up the forms for the curbs
leading into the units

what a team

first of the fence dividers

packing down the topsoil

first load of topsoil




removing the last of the topsoil

making way for the sidewalk

Wednesday, November 11, 2009

today's excellent crew
installing the cabinets

laying the patio stones

getting ready for the patio stones

posts waiting to be set

digging the post holes

getting ready to set the curbs

moving the sheds by
shear determination


Tuesday, November 10, 2009

removing the last of the excess fill
bringing in the sand for the patio stones

lowering the shutoffs

looking for the covered catch basin

grouting of the bathrooms is done

Monday, November 9, 2009

Waterloo fire fighters
moving the excess fill


Happy Birthday

putting together the cabinets

the start of the kitchen cabinets