Wednesday, June 24, 2009

you're missing a lot of fun
setting the forms and
pouring the concrete
in 30 degree weather



Monday, June 22, 2009

today multi tasks were done

sidewalks were poured





the mudding was started

some siding was finished

Wednesday, June 17, 2009

putting up the drywall in the downstairs

painting the lines for the visitor spots




got the last shingle on and the rains came.
Whew what timing




Tuesday, June 16, 2009

a good start on the shingling
are we going to beat the rain?

drywall for the bath

carrying in the drywall

get those screws in




Monday, June 15, 2009

today the upstairs walls were drywalled



Friday, June 12, 2009

todays crew
some RBC members

Dry wall day

doing the ceilings




and a little bit of siding




Thursday, June 11, 2009

delivery of the drywall

taking all the drywall indoors




the last piece going upstairs before the
rains came.
The last of the windows were put in and now
the house is closed in free from any rain




Wednesday, June 10, 2009

insulation and vapor barrier today

along with a bit of siding

putting up the trusses on the garage

at the end of the day
drywalling tomorrow



Tuesday, June 9, 2009

the roof is shingled

finishing the siding

screwing down the floor

moving the trusses for the next build
a few more windows to put in

waiting for the electrical inspection

and then the insulation and vapor barrier

Monday, June 8, 2009

finishing the siding on the end unit


the wiring of the unit as well as the heating
ducts being put in

electricians and sheet metal workers

at the end of Monday in the second week.
the shingling was almost finished before the
rain started

Saturday, June 6, 2009

Todays awesome siding crew

conquering our fear of heights


at the end of the day

finishing the dormer and
ready for the shingles
hopefully before the rains come


the Saturday crew

Friday, June 5, 2009

at the end of the fifth day
roof ready for the singles
firewall put up

bathtub and plumbing done

blueboard on the front of the house

Thursday, June 4, 2009

at the end if the 4th day. Almost all the
sheathing is on the roof

putting up the scafolding

enjoying another fine lunch

driveways were paved today

heating ducts being put in

plumbing being done